Kinistino Public School
Description
For this 4,684 sq.ft polyurethane repour and the Kinistino Public school we patched and prepped the existing floor and poured a new 1.5mm polyurethane top coat. We completed the face lift with two full coats of polyurethane top coat paint, new game lines, logo, lettering and installation of new wall base.
Location
Kinistino, Saskatchewan